Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 


Case History: Aircraft Carrier Sails through Tank Maintenance Project

From JPCL, January 2008

In August 2006, the USS Abraham Lincoln aircraft carrier cruised into Puget Sound in Bremerton, WA, and docked in preparation for a massive tank blasting and coating project that was expected to take nearly six months to complete. Thanks in part to a sophisticated air distribution system and custom-built dessicant dehumidification systems, the carrier was ready to sail two weeks ahead of schedule....
(Login to read the full article)

   

Tagged categories: Marine

Comment Join the Conversation:

Sign in to our community to add your comments.

 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2019, Technology Publishing Co., All rights reserved