Under what circumstances is third-party inspection justified on commercial coating work?


Selected Answers

From Warren Brand of Chicago Coatings Group on April 5, 2016:
I think almost always, although the amount of inspection may vary. We consulted on a project for one of the largest high schools in the Midwest. We identified optimal coating systems and repair protocols for the walls, ceilings and, most importantly, the steel hand rails. We were not, however, hired to conduct inspection services. The wrong paint was applied to the handrails and now, throughout the entire school, the paint is soft and coming off. The paint is so soft, it can be removed with a fingernail. In this case, it would have made good sense to have a third-party inspector on-site occasionally to ensure basic quality control procedures are in place.


Please sign in to submit your answer this question

   

Tagged categories: Business management; Business operations; Business types; Inspection


Current PSF Question | Submit a PSF Question | Full PSF Archive

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2019, Technology Publishing Co., All rights reserved